1932 In general, the measuring component identifies potential flyrock projectiles. If the projectile is physically located in the field, it is measured/scanned and the position is surveyed relative to the identified source hole, and it is logged into FRED. However, in most cases the projectile is not retrieved and then the process is followed as summarised in Figure 9. Figure 9 – Simplified flyrock projectile analysis process flow 3.4 Management Component Figure 10 – Example of a management routine where flyrock is being discussed The management component closes the loop by turning insights from the other components into decisions and continuous improvement. It embeds a governance process around flyrock risk. After each blast
RkJQdWJsaXNoZXIy MTM0Mzk2