2062 Levinson, Zachary, and Roussos Dimitrakopoulos. 2020. “Simultaneous Stochastic Optimisation of an Open-Pit Gold Mining Complex with Waste Management.” International Journal of Mining, Reclamation and Environment 34(6):415–29. doi:10.1080/17480930.2019.1621441. Levinson, Zachary, and Roussos Dimitrakopoulos. 2024. “Simultaneous Stochastic Optimisation of Mining Complexes: Integrating Progressive Reclamation and Waste Management with Contextual Bandits.” International Journal of Mining, Reclamation and Environment 38(9):701–21. doi:10.1080/17480930.2024.2342687. Levinson, Zachary, Roussos Dimitrakopoulos, and Julien Keutchayan. 2023. “Simultaneous Stochastic Optimization of an Open-Pit Mining Complex with Preconcentration Using Reinforcement Learning.” Applied Soft Computing 138:110180. doi:10.1016/j.asoc.2023.110180. Mesa, Jaime A., Diego Hincapie-Florez, Melkis Bobadilla-Vasquez, Lesme Corredor, Oscar Pupo-Roncallo, and Arturo Gonzalez-Quiroga. 2025. “Assessing Technological Trends in Mining Fleet Energy Management toward Sustainable Mineral Extraction.” Resources Policy 109:105714. doi:10.1016/j.resourpol.2025.105714. Morales, Nelson, Sebastián Seguel, Alejandro Cáceres, Enrique Jélvez, and Maximiliano Alarcón. 2019. “Incorporation of Geometallurgical Attributes and Geological Uncertainty into Long-Term OpenPit Mine Planning.” Minerals 9(2):108. doi:10.3390/min9020108. Muttaqin, Benazir Imam Arif, Udisubakti Ciptomulyono, and Nurhadi Siswanto. 2025. “Optimizing Cut-off Grades under Stochastic Price: A Model for Open-Pit Lateritic Nickel Mining with Multiple Products.” Resources Policy 106:105630. doi:10.1016/j.resourpol.2025.105630. Pamparana, G., W. Kracht, J. Haas, G. Díaz-Ferrán, R. Palma-Behnke, and R. Román. 2017. “Integrating Photovoltaic Solar Energy and a Battery Energy Storage System to Operate a Semi-Autogenous Grinding Mill.” Journal of Cleaner Production 165:273–80. doi:10.1016/j.jclepro.2017.07.110. Rahnema, Milad, Bahar Amirmoeini, and Ali Moradi Afrapoli. 2023. “Incorporating Environmental Impacts into Short-Term Mine Planning: A Literature Survey.” Mining 3(1):163–75. doi:10.3390/mining3010010. Saliba, Ziad, and Roussos Dimitrakopoulos. 2020. “An Application of Simultaneous Stochastic Optimisation of an Open-Pit Mining Complex with Tailings Management.” International Journal of Mining, Reclamation and Environment 34(8):592–607. doi:10.1080/17480930.2019.1688954. Smith, Martin, and Roussos Dimitrakopoulos. 1999. “The Influence of Deposit Uncertainty on Mine Production Scheduling.” International Journal of Surface Mining, Reclamation and Environment 13(4):173–78. doi:10.1080/09208119908944244. Spleit, M., and R. Dimitrakopoulos. 2017. “Risk Management and Long-Term Production Schedule Optimization at the LabMag Iron Ore Deposit in Labrador, Canada.” Mining Engineering 69(10):47–53. doi:10.19150/me.7807. Vaziri, Vahid, Ahmad Reza Sayadi, Amin Mousavi, Anita Parbhakar-Fox, and Masoud Monjezi. 2025. “A Sustainable Approach to Mine Waste Management: Optimization and Simulation of Acid Rock Drainage Prevention.” Environmental Earth Sciences 84(16):471. doi:10.1007/s12665-025-124543.
RkJQdWJsaXNoZXIy MTM0Mzk2