Conference Proceedings - World Mining Congress 2026

853 • Safe work sequencing for mechanical, electrical, civil, and earthworks disciplines during the shutdown phase for the primary crusher. • Safe and appropriate work sequencing for civil and mechanical works on the coarse ore bin and grizzly during the shutdown. • Identification of necessary activities to ensure proper operation and commissioning of the crushing system during the post-shutdown stage. RAM Analysis (Reliability, Availability and Maintainability) This analysis was developed in greater depth during the Basic Engineering stage to improve operational reliability, availability, and maintainability of the crushing system. The analysis was integrated into the BIM model and supported by ICE sessions in collaboration with the O&M user. The following value improvements were achieved: • Installation of an overhead crane to improve maintainability time and mechanical availability of auxiliary equipment in the crushing system. • Validation of the optimal location for the overhead crane to ensure reliability and minimise installation clashes. • Installation of a dust extraction system to ensure O&M reliability. • Optimisation of the monorail beam location for maintenance purposes. Additionally, a HAZOP (Hazard and Operability Study) workshop was proposed at the end of the Detailed Engineering stage to ensure operational risk mitigation prior to the construction phase. Final Metrics The results of the applied research were obtained up to December 2020. The evolution of the metrics and controllable factors for each dimension of the VDC framework are summarised below in Figure 7: Figure 7: Metrics Evolution Table Insights and Learnings During the initial weeks, the reaction to change under the VDC framework and the departure from the comfort zone was significant, particularly for the O&M user. Additionally, during the first ICE sessions, the BIM model was not yet ready, which led to a limited understanding of the project and its objectives. However, the BIM model was subsequently delivered in a timely and reliable manner, enabling its full utilisation for VIPs analysis techniques during the development of the project’s Basic and Detailed Engineering.

RkJQdWJsaXNoZXIy MTM0Mzk2