Track 3: Environmental Stewardship

127 Figure 18 – Installation of the geocell (left) and placement of soil cement inside the geocell (right) ACKNOWLEDGEMENTS We would like to thank the technical teams at TDM Brazil and TDM Peru for their contribution and development of innovative solutions. REFERENCES Activos Mineros S.A. Estudio Definitivo del Cierre del Depósito de Desmonte Excélsior, Tomo II (2012). Activos Mineros S.A. Expediente Técnico Recuperación de los servicios ecosistémicos en la microcuenca de la quebrada de Pelagatos, contaminadas por los pasivos ambientales mineros de la Ex Unidad Minera Pushaquilca, distrito de Pampas –provincia de Pallasca – departamento de Áncash, Volumen II (2021). Hawley, M., & Cunning, J. (2017). Mine Waste Dump and Stockpile Design. Australia: CSIRO Publishing. Koerner, R.M., “Designing with Geosynthetics”, 5th Edition, Pearson Prentice Hall, USA, 2005. Koerner, R. M., & Soong, T. Y. (2005). Analysis and design of veneer cover soils. Geosynthetics International, 12(1), 28-49. Lagos, R. (2021). Cobertura de Cierre con Geosintéticos del Pasivo Ambiental Minero Excélsior. Congreso de Geoingeniería 2021,12-14 Julio 2021, Lima, Perú. Lagos, R. (2024). Experiences of mine closure cover with geosynthetic in Peru. 5th PanAmerican Conference on Geosynthetics 2024. Canada. Caressato, W., Todescan, B., & Fierro, G. (2025). Fechamento de Pilha de Resíduos: Aplicação de Geotêxtil, Geomembrana, Geocomposto Drenante, Geogrelha e Geocélula. Artigo Técnico Caso de Obras IGS 2025. Brasil.

RkJQdWJsaXNoZXIy MTM0Mzk2