101169238. The authors gratefully acknowledge the support of the CERENA through FCT Project UID/04028/2025 (https://doi.org/10.54499/UID/04028/2025). REFERENCES Abouzeid, Abdel-Zaher M., and Douglas W. Fuerstenau. 2009. “Grinding of Mineral Mixtures in High-Pressure Grinding Rolls.” International Journal of Mineral Processing 93(1):59–65. doi:10.1016/j.minpro.2009.05.008. Adrien Rimélé, M., Roussos Dimitrakopoulos, and Michel Gamache. 2018. “A Stochastic Optimization Method with In-Pit Waste and Tailings Disposal for Open Pit Life-of-Mine Production Planning.” Resources Policy 57:112–21. doi:10.1016/j.resourpol.2018.02.006. Aghdamigargari, Mehri, Sylvester Avane, Angelina Anani, and Sefiu O. Adewuyi. 2024. “Sustainability in Long-Term Surface Mine Planning: A Systematic Review of Operations Research Applications.” Sustainability 16(22):9769. doi:10.3390/su16229769. Anvari, Keyumars, and Jörg Benndorf. 2025. “Real Time Mining—A Review of Developments Within the Last Decade.” Mining 5(3):38. doi:10.3390/mining5030038. Aramendia, Emmanuel, Paul E. Brockway, Peter G. Taylor, and Jonathan Norman. 2023. “Global Energy Consumption of the Mineral Mining Industry: Exploring the Historical Perspective and Future Pathways to 2060.” Global Environmental Change 83:102745. doi:10.1016/j.gloenvcha.2023.102745. Burgher, Karl E., and Erick Erickson. 1984. “The Optimization of Coal Mine Production Schedules Using Linear Programming: An Example That Determines the Effects of Reclamation Costs and Interest Rates.” Mining Science and Technology 2(1):69–78. doi:10.1016/S0167-9031(84)90223-8. Carrasco, C., L. Keeney, and T. J. Napier-Munn. 2016. “Methodology to Develop a Coarse Liberation Model Based on Preferential Grade by Size Responses.” Minerals Engineering 86:149–55. doi:10.1016/j.mineng.2015.12.013. De Carvalho, Joao Pedro, and Roussos Dimitrakopoulos. 2024. “Simultaneous Shovel Allocation and Grade Control Decisions for Short-Term Production Planning of Industrial Mining Complexes – an Actor-Critic Approach.” International Journal of Mining, Reclamation and Environment 38(1):53–78. doi:10.1080/17480930.2023.2247196. Dimitrakopoulos, R., and S. Ramazan. 2004. “Uncertainty-Based Production Scheduling in Open Pit Mining.” 316. Engeco. 2022. “MINING ENERGY CONSUMPTION 2021.” Fathollahzadeh, Karo, Mohammad Waqar Ali Asad, Elham Mardaneh, and Mehmet Cigla. 2021. “Review of Solution Methodologies for Open Pit Mine Production Scheduling Problem.” International Journal of Mining, Reclamation and Environment 35(8):564–99. doi:10.1080/17480930.2021.1888395. Goodfellow, Ryan C., and Roussos Dimitrakopoulos. 2016. “Global Optimization of Open Pit Mining Complexes with Uncertainty.” Applied Soft Computing 40:292–304. doi:10.1016/j.asoc.2015.11.038.
RkJQdWJsaXNoZXIy MTM0Mzk2