Track 6: Mining Engineering and Mine Planning

REFERENCES Banks, J., Carson II, J. S., Nelson, B. L. y Nicol, D. M. (2005). Discrete-Event System Simulation (4th ed.). Prentice Hall. Castro, R. y Cuello, D. (2018). Hang-up analysis and modelling for Cadia East PC1-S1 and PC2-S1. Proceedings of the Fourth International Symposium on Block and Sublevel Caving. Australian Centre of Geomechanics. https://doi.org/10.36487/acg_rep/1815_15_castro Halatchev, R. and Knights, P. (2011). Simulation-based fleet management in underground mines. Mining Technology, 120(3), 131–140. Law, A. M. (2015). Simulation Modeling and Analysis (5th ed.). McGraw-Hill. Upadhyay, S. P. y Askari-Nasab, H. (2016). Simulation and optimization approach for uncertainty-based short-term planning in open pit mines. International Journal of Mining Science and Technology, 26(2), 227–236.

RkJQdWJsaXNoZXIy MTM0Mzk2