Track 6: Mining Engineering and Mine Planning

online.org/2007/03/1624/>. Caccetta, L. and Hill., S. (2003). An application of branch and cut to open-pit mine scheduling. Journal of Global Optimization. 27, 349-365. hiips://doi.org/10.1023/A:1024835022186. Chicoisne, R., Espinoza, D., Goycoolea, M., Moreno, E., and Rubio, E. (2012). A new algorithm for the open-pit mine production scheduling problem. Operations Research. 60(3), 517-528. hiips://doi.org/10.1287/opre.1120.1050. Costa, J. F. C. L., Niquini, F. G. F., Schneider, C. L., Alcântara, R. M., Capponi, L. N., and Rodrigues, R. S. (2025). Geometallurgical Cluster Creation in a Niobium Deposit Using DualSpace Clustering and Hierarchical Indicator Kriging with Trends. Minerals, 15, 755. hiips://doi.org/10.3390/min15070755. Cullenbine, C., Wood, R. K., and Newman, A.A. (2011). A sliding time window heuristic for open pit mine block sequencing. Optimization Letters. 5, 365-377. hiips://doi.org/10.1007/s11590-0110306-2. Da Mata, J. F. C., Nader, A. S., and Mazzinghy, D. B. (2023) A Case Study of Incorporating Variable Recovery and Specific Energy in Long-Term Open Pit Mining. Mining. 3, 367-386. hiips://doi.org/10.3390/mining3020022. Espinoza, D., Goycoolea, M., Moreno, E., and Newman, A. (2013). MineLib: A library of open pit mining problems. Annals of Operations Research. 206(1), 93-114. GMG (Global Mining Guidelines Group) (2025). Introduction to Geometallurgy. Available from: <hiips://gmggroup.org/introduction-to-geometallurgy-white-paper/>. Hochbaum, D. S. (2001). A new-old algorithm for minimum-cut and maximum-flow in closure graphs. Networks: An International Journal. 37(4), 171-193. hiips://doi.org/10.1002/net.1012. Kirkpatrick, S., Gelatt, C. D., and Vecchi, M. P. (1983). Optimization by Simulated Annealing. Science. 220(4598), 671-680. hiips://doi.org/10.1126/science.220.4598.67. Lamghari, A., Dimitrakopoulos, R., and Ferland, J. A. (2015). A hybrid method based on linear programming and variable neighborhood descent for scheduling production in open-pit mines. Journal of Global Optimization. 63, 555-582. hiips://doi.org/10.1007/s10898-10014-10185-z. Lane, K. F. (1964). Choosing the optimum cut-off grade. Quarterly of Colorado School of Mines. 29, 811- 829. Lerchs, H. and Grossmann, I. F. (1965). Optimum Design of Open Pit Mines. CIM Bulletin. 58, 47-54. Mai, N. L., Topal, E., and Erten, O. (2018). A new open-pit mine planning optimization method using block aggregation and integer programming. Journal of the Southern African Institute of Mining and Metallurgy. 118, 705-714. hiips://doi.org/10.17159/2411-9717/2018/v118n7a4. Martins, S., Campos, P., Mazzinghy, D. (2025). A case study comparing the results of a copper open-pit mine scheduling considering two different approaches for spatial interpolation of

RkJQdWJsaXNoZXIy MTM0Mzk2