Table 5 – Metallurgical Recovery of Au and Ag MR Au (%) Ag(%) Min 82.10 71.02 More Likely 86.15 79.56 Max 90.20 88.10 Figure 4 – Triangular Distribution (MR Au) Figure 5 – Triangular Distribution (MR Ag) Production analysis The analysis of historical information determined what type of distribution the mine's production is associated with. Table 6 – Production Distribution Figure 6 – Triangular distribution of mineral production Figure 7 – Triangular distribution of the movement of waste Production Ore Waste Min 4600 41,000 More Likely 5400 41,400 Max 5600 41,500
RkJQdWJsaXNoZXIy MTM0Mzk2