REFERENCES Allison, P., Bernard, E., & Maerz, K. (2010). Modern accelerators for sprayed concrete: Alkali-free chemistry and effects on long-term strength. Shotcrete Journal, 12(3), 3238. Bernard, E. (2010). Fiber reinforced shotcrete in mining and tunneling: 20 years of development. Proceedings of the Annual Conference of the Canadian Institute of Mining (CIM), Vancouver, Canada. EFNARC (2009). Specification and Guidelines for Sprayed Concrete. European Federation of National Associations Representing Concrete, UK. Garcia, M., Lopez, D., & Flores, X. (2018). Improving development cycle times in underground mining: A case for in-cycle shotcrete. In Proceedings of the MassMin 2018 Conference (pp. 245-256). Sydney: AusIMM. Hochschild Mining PLC (2022). Annual Report 2021: Operational Efficiency Initiatives. London: Hochschild Mining. Jenkins, P.A., Mitchell, J., & Upton, B. (2005). Improved ground control using hydro scaling and in-cycle shotcrete. In Ninth Underground Operators’ Conference, 7-9 March 2005 (pp. 133-138). Perth: The Australasian Institute of Mining and Metallurgy. Ozturk, H., MacDonald, M., & Forbes, B. (2016). Safe re-entry time for in-cycle shotcrete in underground mines. In Shotcrete for Underground Support XI (Engineering Conferences International), Shiraz, Iran. Smith, J., & Andrews, T. (2019). Optimizing ground support installation in rapid development cycles. Tunnelling and Underground Space Technology, 89, 253-261. Trinh, Q., & Macedo, L. (2020). Innovation in underground support: From supplier to partner. Mining Engineering, 72(8), 44-48.
RkJQdWJsaXNoZXIy MTM0Mzk2