Track 7: Andean Flagship Sessions

Figure 3. Calculation of the b-value applying completeness magnitude for Level 2670 CR0600 (pilot); Mw min –0.15; Mw max 1.02. Figure 4. Zoning of maximum probable magnitude (Mw max = 1.02) at Level 2670 CR0600. The highlighted zone corresponds to the pilot area where higher seismic potential is identified, supporting risk-based decision-making. 66

RkJQdWJsaXNoZXIy MTM0Mzk2