Figure 5. Installation of the traffic light control panel along a 4 km underground section, from the timber storage area to the seismic cabinet (Station 11) at Level 2670 (SE zone). This infrastructure enables real-time signal transmission and activation of the alert system across the monitored area. 67
RkJQdWJsaXNoZXIy MTM0Mzk2